Ghostboard pixel

Maintenance Scheduled for Mattagami Water Pollution Control Plant

Planned maintenance will occur at the Mattagami Water Pollution Control Plant starting September 3, 2024. The maintenance involves draining, cleaning, and refilling the chlorine contact tank. This work aims to remove solids from the bottom of the tank and address algae and moss growth on the tank walls.

During this maintenance, the chlorine contact time will be temporarily reduced; however, chlorine will continue to be added to the final effluent. The City of Timmins does not anticipate significant impacts on the final disinfection process. The Ministry of the Environment, Conservation and Parks has been notified, and samples will be collected.

Details of the Maintenance Work:

  • Location: Mattagami Water Pollution Control Plant, 551 Airport Road
  • Start Date: September 3, 2024
  • Start Time: 8:00 AM
  • End Date: On or before September 10, 2024
  • End Time: To be determined
  • Volume Bypassed: To be determined

The final date and time of the maintenance will be posted the following business day after the completion of the required work.